Skip to content
LJ Electrical Group logo LJ Electrical Group Licensed electricians · Geelong

Three-Phase Power Upgrades in Geelong

Most homes run on single-phase power — one active supply line carrying everything the house needs. Three-phase power uses three separate active lines instead of one, delivering roughly three times the capacity at your switchboard. It isn't 'better' electricity, just a lot more of it, supplied in a way heavy equipment and high-draw appliances can use properly. LJ Electrical Group carries out three-phase power upgrades across Geelong and the Bellarine — from Belmont and Highton to Grovedale, Waurn Ponds, South Geelong and Armstrong Creek.

Three-phase is generally for properties with genuinely heavy electrical demand: a workshop running machinery or welding gear, a fast 22kW EV charger, a pool and spa combination, or a big extension or granny flat planned down the track. If your switchboard is already straining on single-phase, a three-phase upgrade gives you real headroom instead of constantly juggling what's switched on at once.

Signs your property may need three-phase power

  • Large machinery or welding gear in a workshop
  • Multiple air conditioners running at once
  • A fast 22kW EV charger
  • A pool and spa combination
  • Ducted heating plus induction cooking
  • Lights dimming or breakers tripping when heavy appliances start
  • Planning a large extension or granny flat

What a three-phase upgrade involves

  • Assessment of your current supply and switchboard capacity
  • Application to the electricity distributor (Powercor) on your behalf
  • Coordination of the distributor's truck appointment
  • Mains upgrade to carry the extra supply
  • New three-phase switchboard and meter panel
  • Licensed Electrical Inspector (LEI) sign-off
  • Full testing and a Certificate of Electrical Safety

Three-phase upgrade pricing

  • Three-phase power is one of the larger jobs we take on — this isn't a small, quick upgrade.
  • A significant portion of the cost is fixed, paid directly to the electricity distributor and the Licensed Electrical Inspector, before any of our own labour begins.
  • These upgrades run into the thousands rather than the hundreds, so it pays to go in with the right expectation.
  • Every property's supply, distance and switchboard condition are different — which is why we quote after assessing your site rather than publishing a flat rate.
  • What determines the price: distance from the street to the switchboard, whether the mains need replacing, overhead versus underground supply, switchboard and meter panel condition, and distributor requirements.
  • We always quote fixed and upfront after assessing the property.
  • Timeline is largely set by the distributor — once Powercor's truck appointment is booked, on-site work is usually done in a day, but their scheduling typically adds the most time to the overall project.

What's included in your quote

Our three-phase quote is all-in, not a base rate with extras added afterwards. We handle all the distributor paperwork and applications on your behalf, from the initial application through to the truck appointment and inspection sign-off. Your quote includes:

  • The distributor application and paperwork
  • Coordination and the distributor's truck appointment
  • The Licensed Electrical Inspector sign-off
  • All labour and materials
  • Testing
  • A Certificate of Electrical Safety

A significant portion of that cost is fixed, paid to the distributor and the Licensed Electrical Inspector rather than to us — not our margin — which is why a three-phase upgrade costs more than most electrical work.

What customers say about our switchboard, meter box & supply work

  • ★★★★★
    I had Zack come to my house to install sub-mains for my new swimming pool, what an experience. Completed the work within set timeframe and helped me with earthing requirements for the fencing around the pool. Could not recommend high enough.
    Troy Malthouse
  • ★★★★★
    We couldn't be happier with the quality of work Zack did on the installing our spa. Running power to the site was seamless and a really neat finish and the meter box got a complete update as part of the overall process. Pricing was incredibly competitive and with no issues at all since we'll turn to Zack for any future work we ever need. A pleasure to deal with.
    Steve Wallis

Licensed, insured & compliant

Licensed REC 36620
Fully insured
Master Electricians Australia member
Certificate of Electrical Safety on every prescribed job

Available across Geelong & the Bellarine

We provide Three-phase power upgrades in these areas and 40+ more suburbs:

Other services

Three-phase power upgrades — FAQs

What is three-phase power and how is it different from single-phase?

Single-phase power delivers electricity down one active line and is what almost every Australian home runs on. Three-phase uses three separate active lines instead of one, giving you roughly three times the capacity at your switchboard. It's not 'stronger' electricity — it's simply a lot more capacity, which lets heavy equipment, multiple appliances or fast EV charging run without overloading the supply — see our EV charger installations page if that's what's driving the upgrade.

How do I know if I already have three-phase?

The easiest way is to check your switchboard and meter — three-phase properties have three active fuses or breakers (often labelled red, white and blue) instead of one, and a meter marked for three-phase supply. If you're not sure, we can check for you, and it's also worth checking your last electricity bill, which usually states the supply type.

Why does a three-phase upgrade cost so much?

Most of the cost isn't labour — it's fixed third-party fees. The distributor (Powercor) charges an application and connection fee, a Licensed Electrical Inspector must sign off the work, and a dedicated truck appointment is needed to change the supply at the street. Those third-party costs are largely fixed regardless of who does the work, which is why three-phase upgrades cost more than typical electrical jobs.

How long does a three-phase upgrade take?

On-site work is usually completed within a day once everything's arranged, but the project itself typically takes a few weeks from start to finish. Most of that time is the distributor's scheduling — Powercor needs to book a truck appointment to change the street supply, and that's largely outside our control. We manage the whole process and keep you updated at each step.

Do I need to deal with the electricity distributor myself?

No. We handle the entire distributor process for you — the application to Powercor, coordinating their truck appointment, and liaising with the Licensed Electrical Inspector for sign-off. You won't need to fill out distributor paperwork or chase up appointments yourself; we manage it from the initial assessment through to the final Certificate of Electrical Safety.

Will I need a new switchboard as well?

Often, yes. Your existing switchboard and meter panel are usually replaced as part of a three-phase upgrade, since they need to be rated for the new supply. Doing both together in one job works out more cost-effective than paying for a separate switchboard upgrade later — see our switchboard upgrades page for more on that work.

Need a licensed local electrician?

Talk to LJ Electrical Group for an upfront, fixed quote — no travel surcharge across Geelong & the Bellarine.

Get a Free Quote

Tell us about the job and we'll get back to you with a fixed, upfront price.

Your details are emailed straight to LJ Electrical Group via Web3Forms and are not stored by this website. See our privacy policy.

Prefer to talk? Call 0433 444 331